Electrical testing

Clever preliminary work

The examination of a wind farm's electrical concept with regard to the existing grid infrastructure prevents subsequent costly improvements. To do this, we start planning the grid connection along with the cabling and transformers during the preliminary stages. At the same time, we also inspect the earthing and lightning protection concept and the correct laying of the cables.


http://www.tuev-nord.de/en/Electrical_testing_6752.htm
Up Recommend page Print page
Electrical_testing_6752.htm

Contact

WIND POWER
windenergietuev-nord.de Contact form


COPYRIGHT 2012 TÜV NORD Gruppe
All RIGHTS RESERVED.

Company

ABOUT US Guidelines Corporate Governance Compliance General Terms and Conditions Annual Reports ORGANISATION THE BRAND: TÜV® Fairs / events / conferences

Competence

EDUCATION ENERGY BUILDINGS HEALTH INDUSTRY IT ENVIRONMENT TRAFFIC CERTIFICATION

International

Profile Presence Projects

Career

TÜV NORD AS AN EMPLOYER ENTRY Job offers FACE-TO-FACE CONTACT

Press

Press releases Publications Press info subscription Press Images

Information

Site map Editorial information Data protection Customer login