Electrical testing
Clever preliminary work
The examination of a wind farm's electrical concept with regard to the existing grid infrastructure prevents subsequent costly improvements. To do this, we start planning the grid connection along with the cabling and transformers during the preliminary stages. At the same time, we also inspect the earthing and lightning protection concept and the correct laying of the cables.